Sign In | Join Free | My udpf.com |
|
Brand Name : RT
Model Number : Pipe Fittings
Certification : CE,ISO,BV,SGS
Place of Origin : Hebei,China
MOQ : 2000 pieces
Price : To be Negotiable
Payment Terms : T/T, L/C
Supply Ability : 20000pieces/per month
Delivery Time : 35 working days
Packaging Details : By Wooden Case or Pallets or as customer's request
Type : Carbon steel pipe fittings
Standard : ASME/ANSI B16.9 B16.48 B16.25
Size : DN10-DN1200
Thickness : SCH10-SCHXXS
Material : A234WPB
Surface : Black paint,Sandblast,oiled
Cert : ISO9001,ISO14001,ISO45001
Usage : Construction Industry,Chemical Industry,Petroleum Field,Nuclear Energy
ASTM Forged Butt Welding Carbon Steel Pipe Fitting schedule 80 schedule 40
Description:
Carbon Steel Pipe Fitting 90 Degree Elbow 45 Degree Elbow A234/A420 Wpi B16.9, is widely used in kinds of industry and building areas all over the world.It can be used for shipbuliding,petroleum,chemical,gas,power,construction,etc.
In the pipeline system, the pipe elbow is a pipe fitting that changes the direction of the pipeline. According to the angle, there are three most commonly used ones: 45°, 90°, and 180°. In addition, according to engineering needs, it also includes other abnormal angle elbows such as 60°.
Size: 1/2"-36" can be seamless, 5"-110" can be welded; Surface: Black painting or color painting for carbon steel and alloy steel fittings
Specifications:
ASTM Forged Butt Welding Carbon Steel Pipe Fitting schedule 80 schedule 40 | |
Standards | ASME/ANSI B16.9, ASME/ANSI B16.11, ASME/ANSI B16.28,JIS B2311, JIS B2312, DIN 2605, DIN 2615, DIN 2616, DIN 2617, BS 4504, GOST 17375, GOST 30753, GOST 17378 |
Bending radius | Short Radius(SR), Long Radius(LR), 2D, 3D, 5D |
Degree | 45 / 90 / 180, or customized degree |
Size Range | Seamless type: ½" up to 28" |
Welded type: 28"-to 72" | |
WT Schedule | SCH STD,SCH10 to SCH160, XS, XXS, |
Carbon Steel | A234 WPB, WPC; A106B, ASTM A420 WPL9, WPL3, WPL6, WPHY-42WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, |
Alloy Steel | A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
Applications | Petroleum industry, chemical, power plant, gas piping, shipbuilding. construction, sewage disposal,and nuclear power etc. |
Packaging material | plywood cases or pallets, or as per customer's requirements |
Production Period | 35 working days for normal orders |
FAQ:
1.)Are you a trading company or Factory?
We are a real factory with our own producing machine and warehouse,started to do business from year 1993
2.)How long time of your longer cooperation customer?
Many customers have long cooperation with us,such as European customer cooperated with us 15years.and more.
3.)What is your advantage?
Best quality,low price,special service,each customer information record.
4.)What about your delivery time?
quantity less than 500tons,25days after get deposit,above 500tons will need 30-35 working days.
![]() |
Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld Images |